The first weeks after go-live: what support should cover

I-1

Plan a hypercare period with runbooks, clear escalation, daily check-ins and measures that show the new way works, then hand over on agreed criteria and date.

Published · By National Front Corp.

Support in the first weeks after go-live should cover a defined hypercare period: people on hand who know the new system or process, runbooks for the problems you can foresee, a clear escalation path, a short daily check-in and a few measures that show whether the new way is working. It should also end on purpose, with handover criteria and an exit date agreed before launch, so that your own team owns the operation instead of depending on outside help.

This applies whether the change is a new system, an automated workflow, a reorganized process or a new site.

What is hypercare, and how long should it last?

Hypercare is a planned period of heightened support that starts at go-live. During it, the people who built or introduced the change stay close to the work, response times are shorter than normal, and problems are fixed while the details are still fresh.

Its length depends on the rhythm of the work, not on a standard number of weeks. It should cover at least one full cycle of the events that matter most: the first month-end close, the first payroll run, the first peak day, the first shipment to a major customer. A change that looks stable on a quiet Tuesday can still fail at the first quarter-end.

Set the start and end dates before launch, along with the criteria for ending it. Decide who is on hand, where and when: on site for the first days if people need someone beside them, remotely once questions slow down, and with extended hours around critical events.

What should the runbooks contain?

A runbook is a short written procedure for a task or a problem, written so that someone other than its author can follow it under pressure. Prepare one before go-live for everything you can foresee:

  • Routine operations: starting and stopping jobs, running scheduled tasks, adding users, changing a rule.
  • Known failure modes: what the symptom looks like, what to check first, how to fix or work around it and when to escalate.
  • Recovery: how to rerun a failed batch, restore data or switch to a manual fallback.
  • Common user questions, with the answers that worked in training.

Have the people who will run the operation test each runbook, not only the people who wrote it. During hypercare, update the runbooks every time a new problem appears or a step turns out to be wrong. By the end, they should describe how the work really runs.

Who handles a problem, and how fast?

Every issue should have one way in, such as a single queue, form or channel, so that nothing is lost in private messages. From there, a simple escalation path decides who acts:

  1. First line: trained super-users or the service desk answer questions and apply known fixes from the runbooks.
  2. Second line: the hypercare team investigates problems that are new or need configuration changes.
  3. Third line: the vendor, the developers or the owner of a connected system handle defects and deeper issues.

Define severity levels in plain terms, such as whether work has stopped, is degraded for many people or is inconvenient for a few, and agree on how quickly each level gets a response. Name a primary and a backup contact at each line, including evenings and weekends if the operation runs then. Decide in advance who can authorize a workaround or a rollback, so that a serious problem does not wait for a meeting.

What happens in the daily check-in?

A short meeting at the same time every day keeps everyone working from the same facts. Keep it brief and structured:

  • new issues since the last check-in, by severity
  • open issues, their owners and expected resolution
  • the few measures that show whether the new way is working
  • decisions needed today, and who will make them

The attendees are the business owner, the hypercare lead, the technical lead and someone who represents the people doing the work. Send a short written summary afterward so that people who missed it know what changed. As issues decline, move the check-in to every other day and then to weekly. That change in frequency is itself a sign of progress.

Which measures show the new way is working?

Choose a handful of measures before go-live and compare them with the baseline taken before the change:

  • Outcome: volume processed, cycle time, error and rework rates, backlog.
  • Adoption: the share of work going through the new path rather than old workarounds or side spreadsheets.
  • Support load: new tickets per day by category, time to resolve and repeat issues.
  • Health: failed jobs, the size of the exception queue and alerts.

Watch the trend rather than a single day. Support requests usually rise at launch and then fall. If they level off instead, the same problems keep coming back, and a runbook, a training gap or the design needs attention.

If the change is an automated workflow, a rising exception rate is an early warning that the rules or the inputs need another look. The workflows our process automation team delivers record what ran and show why they stopped, which makes that measure easy to follow from the first day.

How do you hand over without creating dependence?

Hypercare ends when agreed criteria are met, not when people get tired or the budget runs out. Write the criteria before go-live. Typical ones include:

  • no open critical issues, and no new ones for an agreed period
  • key measures at or near target through at least one full cycle of the work
  • runbooks updated and used successfully by the internal team
  • the internal team resolving routine issues without help
  • escalation contacts for steady-state support confirmed, including vendor support
  • open non-critical issues listed, each with an owner and a date

Set a planned exit date alongside the criteria. If the criteria are not met by then, extend for a specific reason and a short period, not indefinitely.

The best protection against permanent dependence is to shift the work gradually. In the first days, outside support may do much of the fixing while your people watch. By the middle, your people do the work while support watches. By the end, your team leads and support only answers questions. Every fix should leave behind a runbook update or a person who now knows how to do it. A written handover then closes the period: what was done, what remains open, what to watch and whom to call.

For how support fits with automation, logistics and resources, see Operations, Automation and Optimization.

If you have a launch coming and want to plan the weeks after it, our operational support team can go through that plan with you in an exploratory meeting, including the handover criteria and the exit date.

Questions we hear often

What is hypercare after go-live?
Hypercare is a planned period of heightened support that begins when a new system, process or site goes live. The people who built or introduced the change stay close to the work, response times are shorter than usual and problems are fixed while the details are fresh. It has a defined start, an agreed end date and written criteria that must be met before normal support takes over.
How long should hypercare last?
Long enough to include every critical event in the work at least once, such as a period-end close, a payroll run or the busiest day of the week. The right length follows the rhythm of the operation rather than a standard number of weeks. Set the exit date and the criteria before launch, and extend only for a specific reason and a short, defined period.
What should happen when a serious problem appears after go-live?
Raise it through the single intake channel, assign a severity and alert the named contact for that level. The first goal is to get the work flowing again, through a documented workaround, a manual fallback or a rollback authorized by a person named in advance. Tell affected users what is happening and when to expect an update. Afterward, find the cause and update the runbook.
Should the vendor or the internal team provide support after go-live?
Usually both, with clear roles. The vendor or implementer knows the system and handles defects and configuration. The internal team knows the work and should own the operation from the first day, with trained super-users answering routine questions. During hypercare the two work side by side. At handover, the internal team leads and the vendor becomes a defined escalation point under its normal support terms.