SR&ED tax credits: what counts as experimental development

I-1

For SR&ED, experimental development means a systematic attempt, by experiment or analysis, to resolve a technological uncertainty and achieve an advancement.

Published · By National Front Corp.

For the Scientific Research and Experimental Development (SR&ED) program, experimental development is work that tries to achieve a technological advancement by resolving a technological uncertainty that standard practice cannot resolve, through a systematic investigation by experiment or analysis. Routine engineering, market research and style changes do not count, however difficult or costly they are.

This article is general information, not tax advice: eligibility depends on the facts of each claim and is decided by the Canada Revenue Agency (CRA), so work with an SR&ED specialist or your accountant.

What does the CRA look for?

The Income Tax Act defines SR&ED as a systematic investigation or search carried out in a field of science or technology by means of experiment or analysis. It covers basic research, applied research and experimental development. For experimental development, the CRA examines, in plain words:

  1. A scientific or technological uncertainty. At the start, you could not know whether you could reach the goal, or how, using the knowledge and experience generally available in the field. An uncertainty that a competent professional could resolve with standard techniques does not count, even if it is new to your team.
  2. A systematic investigation. You defined the problem, formed hypotheses aimed at reducing the uncertainty, tested them through experiment or analysis, and drew conclusions that shaped the next step.
  3. The aim of a technological advancement. The work sought knowledge that advances the understanding of a technology beyond what was generally available, not only a new product for your market. The advancement lies in what was learned, not in the commercial result.

Some supporting work can be included when it is commensurate with the needs of the experimental development and directly supports it: engineering, design, computer programming, data collection, testing or mathematical analysis carried out for the experiments. Most projects mix eligible and ineligible work, and a claim covers only the part that meets the criteria.

What usually does not qualify?

The law excludes several kinds of work outright, however demanding they are:

  • market research and sales promotion
  • quality control and routine testing of materials, devices, products or processes
  • research in the social sciences or the humanities
  • style changes
  • routine data collection
  • commercial production of a new or improved product, and commercial use of a new or improved process
  • prospecting, exploring or drilling for, or producing, minerals, petroleum or natural gas

Beyond those exclusions, the most common reason work does not qualify is that it is routine engineering: applying known methods, even skilfully, to build something new for your organization. Being first in your market, or first in your company, does not make the work experimental. The test is the knowledge generally available in the field, not the knowledge inside your team.

What records should you keep as the work happens?

The CRA reviews claims and can ask for evidence that the work took place as described. It expects the hypotheses, tests and results to be documented as the work progresses, and records made at the time carry far more weight than an account written months later.

Useful records include:

  • a project plan stating the technological objective and the uncertainty at the outset
  • the hypotheses, and the experiments designed to test them
  • test protocols, data, results and analysis, including the tests that failed
  • design documents, drawings, prototypes and the version-control history of the code
  • meeting notes recording decisions to change approach, and the reasons
  • time records showing who worked on the experimental work, and when
  • records of materials consumed and of contracts with outside firms

The simplest way to keep them is to use the tools the team already works in: the issue tracker, the code repository, lab notebooks and a shared experiment log, with a date on everything. Records built into daily work are more complete than a separate diary kept for the claim.

How does a proof of concept or research stage produce that evidence?

A well-run proof of concept already has the shape the program looks for. It starts with a written question about the riskiest technical assumption, which is close to a statement of the uncertainty. Its success and kill criteria are testable hypotheses. It runs in a fixed time box with a log of what was tried, and it ends in a decision memo that records what was learned, including what did not work.

Longer work follows the same pattern at a larger scale. In frontier research, each stage has its own question, stop condition and stage report, and the research record keeps the notes, data, code and dead ends from every stage.

Structure is not eligibility. A proof of concept that confirms a commercial product works as advertised may be useful and still involve no technological uncertainty at all. What good structure does is make sure that, where experimental work did take place, the evidence of it exists.

How and when is a claim filed?

A corporation claims SR&ED on Form T661, Scientific Research and Experimental Development (SR&ED) Expenditures Claim, filed with its income tax return together with the schedule that calculates its investment tax credit. The claim has to be filed within 12 months after the filing due date of the return, which for a corporation generally means within 18 months after the end of the tax year in which the expenditures were incurred. The deadline is strict, and a claim filed after it is lost for that year.

The credit depends on who claims:

  • Canadian-controlled private corporations (CCPCs) can earn an enhanced investment tax credit, which is refundable, on eligible expenditures up to an annual limit that depends on the size of the corporation.
  • Other corporations generally earn a basic credit at a lower rate, which is usually not refundable and is applied against tax payable.

Recent federal budget announcements have proposed changes to the limits and to who can access the enhanced credit, so confirm the rates and limits that apply to your tax year with your adviser.

Provinces add their own credits. In Quebec, research and development credits are administered by Revenu Québec, with their own rules and forms, and are claimed separately from the federal claim, which matters for organizations in Montreal and across the province. Ontario offers its own credits, including the Ontario Innovation Tax Credit for qualifying corporations, claimed with the corporate return; our Toronto page describes how we work with organizations there. Provincial credits are generally treated as government assistance that reduces the expenditures on which the federal credit is calculated, so the federal and provincial claims are best prepared together.

If you are planning experimental work and want the question, the tests and the results on record from the first day, our proofs of concept team can help you frame it in an exploratory meeting. The eligibility decision and the claim itself remain with your tax adviser and the CRA.

Questions we hear often

Does software development qualify for SR&ED?
Some does. Software work can qualify when it tries to overcome a technological uncertainty that standard practice and publicly available knowledge cannot resolve, through a systematic investigation with hypotheses, tests and recorded results. Building features with established tools, configuring commercial products or integrating well-documented systems generally does not qualify, however complex the project. The uncertainty has to be technological, not a question of business requirements, schedule or budget.
Can failed experiments qualify for SR&ED?
Yes, they can. The program looks at whether the work was a systematic attempt to resolve a technological uncertainty and advance the knowledge available in the field, not at whether the product succeeded. An experiment showing that an approach does not work can be part of an eligible project, provided the hypotheses, tests and results were recorded as the work progressed. Eligibility still depends on the facts, and the CRA decides.
Can we claim SR&ED for work an outside firm does for us?
Often, yes. When an outside firm performs SR&ED on your behalf, the payer can generally claim part of the contract payments as eligible expenditures, and the same work cannot be claimed twice. The work itself still has to meet the criteria and, in general, be performed in Canada. Because the contract terms affect who can claim what, raise SR&ED with your tax adviser before the contract is signed, not at year end.
Does the work have to be done in Canada?
Generally, yes. SR&ED has to be carried out in Canada to qualify, with narrow exceptions set out in the rules. When part of a project happens elsewhere, such as testing at a foreign site or development by a team in another country, that portion is usually excluded. If an outside firm does part of the work, where its people actually perform it matters, not only where the firm is based.