Staging a long research program so each stage can fail safely
Published · By National Front Corp.
Split the program into stages, each with one written question, a fixed budget and time limit, and criteria set before the stage begins for continuing, changing course or stopping. Track the technology’s maturity on a common scale such as Technology Readiness Levels, keep a full record of what was tried, and report to funders against the agreed criteria rather than against activity. A stage that fails then costs one stage, not the program.
Why stage a long research program?
Long programs tend to fail in one of two ways. They continue too long on a line of work that stopped being promising, because so much has already been spent, or they drift until nobody can say which question they are answering. Both are expensive, and both are hard to see from inside.
Staging turns one large commitment into a series of smaller ones. Each stage buys specific information, and the budget for the next stage is released only when that information justifies it. The program keeps its long-term goal, but no single decision commits the whole budget.
How do Technology Readiness Levels help?
Technology Readiness Levels (TRLs) are a nine-level scale of technical maturity. The scale was developed at NASA and is now widely used, including in the European Union’s research programs and in Canadian federal programs. The European Commission’s wording, in three groups:
- TRL 1 to 3: basic principles observed; technology concept formulated; experimental proof of concept.
- TRL 4 to 6: technology validated in the lab; technology validated in a relevant environment; technology demonstrated in a relevant environment.
- TRL 7 to 9: system prototype demonstrated in an operational environment; system complete and qualified; actual system proven in an operational environment.
The scale gives each stage a goal that people outside the team understand, such as taking a sensing method from TRL 3 to TRL 4. It also makes progress comparable across years and across lines of work.
Two cautions apply. The levels were written with hardware and systems in mind, so for software, data methods or processes, write down what each level means for your technology before you use it. And agree on who assesses the level, and with what evidence, so that progress is demonstrated rather than declared.
What should each stage gate decide?
A stage gate is the review at the end of a stage. It has four possible outcomes: continue as planned, continue with changes, pause, or stop. The decision is made against criteria written before the stage began, such as:
- Technical results: did the stage meet the thresholds it set, and were the results reproduced?
- Remaining uncertainty: what is still unknown, and is it smaller than before?
- Cost of the next step: what the next stage would need in time, people, equipment and budget.
- Strategic fit: does the problem still matter as much as it did when the program began?
The gate also approves the question, budget and criteria for the next stage, which is where much of its value lies: each stage is scoped with what the previous one learned. A gate is only as good as the written rules it applies, and framework design is how those rules get set before anyone is attached to a result.
Why decide kill criteria in advance?
Because judgment changes once people are invested. After a year of work, almost any result can look like progress, and every setback can look like a reason to try one more variation. Criteria written at the start of a stage, before any results exist, keep the decision honest.
Good kill criteria are specific and measurable. For example: “If the coating does not hold its performance through the planned number of stress cycles, this line of work stops at the gate.” Write them for each line of work, and distinguish between stopping a line and stopping the program.
Be equally clear about what does not count as a reason to continue: money already spent, the size of the team, or a promising result from an experiment other than the one planned. An unexpected finding deserves attention, but as a candidate for its own line of work with its own question and criteria, not as a reason to extend the current one.
What should the program record contain?
Everything that was tried, not only what worked:
- the question, hypotheses and criteria of every stage
- methods and protocols, and the reasons they were chosen
- data, code and analysis, stored so results can be reproduced
- results, including negative and inconclusive ones
- every gate decision and the reasons given for it
Long programs outlive the people who start them. The record lets a new team member understand why a path was abandoned without repeating the work, and it gives funders and auditors a documented account of what the money produced. A data management plan, version control and a short report at each gate are usually enough to keep it complete.
How do portfolio thinking and funder reporting fit together?
Run several lines of work at once, at different levels of maturity, and expect most early lines to stop; that is the reason for running several. Judge each line by criteria suited to its stage: an idea at TRL 2 should not be measured against a demonstration at TRL 6. At each gate, move the budget freed by stopped lines to the lines that earned it.
Report to funders the way the gates work. Each report should state the stage question, what was done, the results against the criteria, the current TRL, the gate decision and its reasons, and the plan and budget for the next stage. Report negative results as plainly as positive ones, with the evidence behind them. Where a funder, such as a public program, a board or an investor, sets its own milestones or reporting format, map the stages onto them at the outset so reports do not have to be rewritten.
When one specific uncertainty blocks a decision, a proof of concept can settle it in weeks, before a longer program is committed.
If your organization is planning research that will take years, our frontier research team can help you define the first stage, its question and its stop conditions in an exploratory meeting.
Questions we hear often
- How long should each stage of a research program be?
- Long enough to answer the stage question, and short enough that stopping costs only what the organization is prepared to lose. Many programs use stages of a few months, with earlier stages kept shorter because uncertainty is highest at the start. The right length also depends on the experiments involved: some materials, biological or field tests need months to produce a single usable result, and the stage has to allow for that.
- Is stopping a research program a failure?
- Not when it happens at a gate, for reasons agreed in advance. A stop means the program learned, at the lowest cost available, that a line of work will not deliver what it needs. The value is in the record: documented negative results keep the organization and its funders from paying for the same experiment twice, and the remaining budget can move to stronger lines of work.
- Does a high Technology Readiness Level mean a product is ready for market?
- No. Technology Readiness Levels measure technical maturity only: whether the technology works, and in what environment it has been shown to work. They say nothing about cost, demand, regulatory approval or the ability to produce at scale. Companion scales, such as manufacturing readiness levels, cover some of those questions. A technology can reach a high TRL and still fail commercially, so market questions need their own work.
- Who should sit on a stage-gate review?
- The sponsor who controls the budget, at least one senior technical reviewer who is not on the research team, and someone who represents the eventual use of the results. The research lead presents the evidence and answers questions but does not grade their own stage. Keeping the same core reviewers across gates helps, because they can judge whether each stage built on the last.